Construction Notes Manager |
|||||||||
CNM "Construction Notes Manager" Tutorial - Quick Start |
|||||||||
Creating a Master Notes File |
|||||||||
Inserting Key Notes |
|||||||||
Importing Key Notes Table |
|||||||||
Tip: |
|||||||||
4. The program will then give the following prompt: List which notes from CONSTNOT.TXT? All/Used |
|||||||||
5. The program also creates a csv file (comma delimited file) which is named the same as the drawing file. In this example it will create a file called Cover plan with no extension. However, this file can be opened with Excel, Quattro Pro, or other spreadsheet program to use in preparing budgets, cost estimates, or in back checking the plans for quality control. See Figure 8.1 The csv file shows all of the used construction notes broken down on a sheet by sheet basis, including the quantities per each sheet and the total plan set quantity. |
|||||||||
Figure 8.2 |
|||||||||
Thank you for going through this tutorial! Please also refer to the "Help" menu item in the CNM pulldown menu for additional reference information. |
|||||||||